Roof replacement in Cleveland.
Full tear-off to the deck and a complete Owens Corning roof system on Cleveland homes, with most finished in a single day. Our office is just past the city line from Lee-Harvard.
Owens Corning Preferred ContractorWe install Owens Corning shingles, registered for warranty in your name.- One-day installs on most homes
- Written estimate in 24 hours
- 4.9 stars, 105 Google reviews
East Side
Owens Corning Preferred Contractor
4.9 stars, 105 Google reviews- 1,000+insurance claims worked
- OHLicensed, bonded & insured
- 24/7Call or text, any hour
Cleveland, Cuyahoga County
What Cleveland roofs need.
Radiant works on Cleveland’s East Side, in the neighborhoods closest to our Bedford Heights office: Lee-Harvard, Mount Pleasant, Union-Miles and Slavic Village.
Cleveland homes and what’s under the shingles
Cleveland has some of the oldest housing in the region. Census estimates put more than half of the city’s homes before 1940, many of them two-and-a-half-story frame houses and two-family Cleveland doubles on narrow lots. Lee-Harvard is the exception: about two thirds of its houses were built after 1950, mostly ranches and colonials.
Many East Side homes have two-story walls, steep gables and old chimneys, so we plan staging and flashing work before the crew shows up.
How we replace a roof
Tear-off to the wood, deck repair, drip edge, ice and water shield along the eaves and in the valleys, synthetic underlayment, starter strip, Owens Corning Duration shingles and ridge caps. Tarps go over the beds, plywood goes under the dumpster tires, and a magnetic sweeper goes over the yard before the crew leaves your Cleveland street. Read more on our roof replacement page.
Weather in Cleveland
Cleveland winters bring lake-effect snow off Lake Erie and long stretches of freeze and thaw, which is when old flashing and worn shingles give out. Ice and water shield along every eave and valley is standard on our roofs here.
Permits and paperwork in Cleveland
The city requires a residential permit to reroof, filed through its online permit portal. Replacing shingles in the same material on 10 percent of the roof or less, or patching a leak, counts as a minor repair with no permit. Homes in a city landmark district, like Miles Park or Broadway Avenue, go through the Landmarks Commission: staff can approve a like-for-like replacement, while changing slate, wood or tile, or adding a metal roof, needs design review.
Cost
What a new roof costs in Cleveland.
Size in squares, pitch, layers to remove, soft decking, and the chimneys, skylights and walls that need flashing set the price. Every one of those is its own line on your written estimate.
For a starting number before anyone visits, the instant roof quote measures your roof from satellite imagery in about a minute. Financing through more than 30 lending partners starts with a soft credit pull.
What's included
Every Cleveland job includes:
- Tear-off to the deckEvery old layer off, so we can see the wood.
- Deck repair at a written per-sheet priceNo surprise invoice.
- Ice and water shieldAt the eaves and in every valley.
- Owens Corning shingle systemUnderlayment, drip edge, starter, shingles, ridge.
- Flashing and ventilationChimneys, walls and vents redone, airflow balanced.
- PermitWe file the Cleveland reroof permit and any landmark review.
- Magnetic sweep and warrantyCloseout photos, warranty in your name.
Our work near Cleveland
Radiant jobs near Cleveland.
Each one has its own page with photos on our current site.
Ponding water, failing seams and worn flashing. Full tear-off and a new low-slope roof system.
Bad decking replaced before a new Owens Corning Duration roof in Williamsburg Gray.
The whole deck replaced, then the roof installed in a day and a half after a long insurance approval.
Reviews
What homeowners say about Radiant.
“Replaced part of the roof at my church. Competitively priced, extremely professional, and an excellent job.”
“After completing the job it was like they were never there. Except for the beautiful new roof.”
“From meeting for an estimate to wrapping up the job, Jared was involved in every step. Would use Radiant Roofing again.”
Cleveland questions
Roof replacement in Cleveland: common questions.
Do I need a permit to replace my roof in Cleveland?
Yes. Cleveland requires a residential permit to reroof. In a landmark district such as Miles Park or Broadway Avenue, the Landmarks Commission reviews it too. Radiant files the permit.
How long does a roof replacement take in Cleveland?
One day for most homes. Large or steep roofs, several old layers or heavy deck repair can push it to a second day, and the estimate says so up front.
Will insurance pay for a new roof in Cleveland?
If hail or wind damaged the roof, your policy may cover it. We photograph every slope, meet your adjuster on the roof and review the scope line by line. You file and own the claim. We are roofers, not public adjusters.
What shingles do you install?
We install Owens Corning shingles, mostly Owens Corning Duration, in sixteen colors you can try on our 3D roof. We also install metal and low-slope systems.
Which parts of Cleveland do you cover?
All of it, including Lee-Harvard, Mount Pleasant, Union-Miles and Slavic Village on the East Side. Our Bedford Heights office is just past the city line from Lee-Harvard.
Nearby
Roof replacement in nearby towns.
- Roof replacement in Garfield Heights
- Roof replacement in Shaker Heights
- Roof replacement in Cleveland Heights
- Roof replacement in Bedford Heights
- Roof repair in Cleveland
- Roof inspection in Cleveland
- Roof installation in Cleveland
- Solar panels in Cleveland
- Commercial roofing in Cleveland
- Gutters and downspouts in Cleveland
- Everything we do in Cleveland
- Roof replacement: the full guide
Also on this site: free roof inspections, the insurance claim process and the instant roof quote. Page reviewed November 2026.
The sign stays lit. Call or text any hour.
Get your Cleveland roof inspected.
Free inspection, photos of every slope, and a written estimate within 24 hours.
(216) 530-6836Takes 30 seconds. We reply within 30 minutes during business hours, first thing in the morning after hours.
Go to the form →