Skip to the content
Menu
Roof installation · Bedford Heights & Cuyahoga County

New roof installation, done right the first time.

Shingle, metal and flat roofs on houses, additions, garages and new builds. Every layer goes on the way the manufacturer specifies, so the warranty holds and the roof does its job for decades.

Owens CorningOwens Corning Preferred ContractorWe install Owens Corning shingles, registered for warranty in your name.
  • Licensed, bonded & insured in Ohio
  • Shingle, metal & flat roofs
  • Free inspection and estimate
New shingle roof installed by Radiant Roofing in Northeast OhioFree estimate
Measure your roof online in about a minute.
Type your address and we size your roof from satellite imagery. Your final price comes in writing after a free inspection.
Get my instant roof quote

Our expertise

Roof installation in Bedford Heights and Cuyahoga County.

Two roofs can use the same shingle and last very different lengths of time. The difference is the installation: the nails, the underlayment, the flashing and the ventilation that nobody sees from the street. Radiant Roofing installs every roof to the manufacturer’s instructions, because that is what the warranty is written against.

This page covers how we install a roof. If you are replacing an existing roof, see roof replacement for tear-off, insurance and financing.

Signs it’s time for a new roof

Call us for a free inspection if you notice any of these:

  • The roof is more than 20 years old.
  • Shingles are curling, cracking or missing.
  • Granules are collecting in the gutters or at the downspouts.
  • You can see daylight through the deck from the attic.
  • Water stains keep coming back on the ceiling.
  • Hail has bruised or cracked the shingles.

How we install a shingle roof

The deck comes first. We check every sheet, replace anything soft, and make sure it is fastened down. Drip edge goes along the eaves and rakes. Ice and water shield goes along the eaves, in the valleys and around chimneys and skylights, where water and ice collect. Synthetic underlayment covers the rest of the deck.

Then the starter strip, so the first course seals, and the shingles, nailed in the zone the manufacturer marks on each one. Flashing is worked into the shingles at every wall, chimney and pipe. Hip and ridge caps and the ridge vent finish the top. The last check is ventilation, so the intake at the soffits matches the exhaust at the ridge.

Metal roofs

We install standing seam and metal shingle roofs. Metal costs more up front and takes longer to install than shingles. It sheds snow, handles low pitches well and suits owners who plan to stay in the house a long time. We price it next to shingles at the estimate so you can compare.

Flat and low-slope sections

Porch roofs, rear additions and garages often have a pitch too low for shingles. Those get a membrane, TPO or EPDM, tied into the shingle roof with proper flashing. Low-slope sections are where most of the leaks we repair start, so we treat the tie-in as its own job.

Additions, garages and new builds

For an addition, the new roof has to tie into the old one without a seam that leaks. For a detached garage or a new build, we plan the materials, valleys and drainage with you before anything is ordered, and we coordinate with your builder’s schedule. We also plan where the water goes, so gutters and downspouts land it away from the foundation.

Permits, cleanup and warranty

We pull the building permit your city requires. Tarps go over the landscaping and plywood under the dumpster tires, and a magnetic sweeper goes over the yard before we leave. As an Owens Corning Preferred Contractor, we can offer Owens Corning’s system warranty options and register the warranty in your name. Radiant is licensed, bonded and insured in Ohio and a member of the Cuyahoga East Chamber of Commerce.

Installation details

What goes under the shingles.

LayerWhere it goesWhy it matters
Roof deckThe whole roofSoft or rotted sheets get replaced so nails hold and the roof stays flat.
Drip edgeEaves and rakesCarries water off the roof edge and into the gutter instead of behind it.
Ice and water shieldEaves, valleys, chimneys, skylightsSeals around nails and stops ice dam meltwater from reaching the deck.
Synthetic underlaymentThe rest of the deckA second line of defense under the shingles.
Starter stripFirst course at the eaves and rakesGives the first row of shingles a sealant strip so wind can’t lift it.
FlashingWalls, chimneys, pipes, skylightsWhere most leaks start. Worked into the shingles, not caulked on top.
Ridge vent and intakeRidge and soffitsBalanced airflow keeps the attic cool in summer and dry in winter.

What's included

Every Radiant roof installation includes:

  • Deck check and repairEvery sheet checked, soft wood replaced.
  • Drip edge and starter stripAt the eaves and rakes.
  • Ice and water shieldEaves, valleys, chimneys and skylights.
  • Synthetic underlaymentOver the rest of the deck.
  • Shingles nailed to specIn the zone the manufacturer marks.
  • Flashing at every wall and penetrationWorked into the roof, not caulked on top.
  • Balanced ventilationIntake and exhaust sized for the attic.
  • Permit, cleanup and magnetic sweepWe pull the permit and pick up the nails.
  • Walkthrough and warrantyCloseout photos and the warranty registered in your name.

How it works

How a new roof installation goes.

  1. Free inspection

    We measure, check the deck and attic, and talk through materials.

  2. Written estimate

    Within 24 hours, with options side by side.

  3. Materials and schedule

    You pick the roof and color. We order and set the date.

  4. Install day

    One day for most homes, longer for metal and large roofs.

  5. Walkthrough and warranty

    Closeout photos and warranty paperwork.

Our work

Recent new roof installations.

Each one has its own page with photos on our current site.

Hunting Valley · SOM Center Rd
Steep roof, claim won after a denial

Leaking roof with missing shingles. The claim was turned down at first and approved months later. Crew worked tied off, in sections.

Moreland Hills
New roof, then solar panels

Full tear-off and a new shingle roof first, then the panels mounted and wired to the electrical panel.

University Heights
Two-story colonial near John Carroll

Full replacement with Owens Corning Duration shingles, synthetic underlayment and a new ridge vent.

Euclid · Locherie Ave
Very steep, cut-up roof, fully re-decked

The whole deck replaced, then the roof installed in a day and a half after a long insurance approval.

Warrensville Heights · Jennings Ave
15 sheets of delaminated plywood

Bad decking replaced before a new Owens Corning Duration roof in Williamsburg Gray.

Meet the owner · 2 min

A message from Jared.

Jared Lichtin, owner of Radiant Roofing in Bedford Heights, in two minutes.

Straight answers

Roof installation questions.

What is the difference between roof installation and roof replacement?

Replacement means tearing off an old roof and installing a new one. Installation is the work of putting the new roof system on, whether it is replacing an old roof or covering a new addition, garage or house. Every replacement includes a full installation.

How long does it take to install a new roof?

One day for most homes with architectural shingles. Metal roofs, steep or complex roofs and large homes take longer. Your estimate tells you how many days to plan for.

What kind of roof should I get?

Most East Side homes get architectural shingles. Metal makes sense if you plan to stay long term or have low-pitch sections that shed snow badly. Flat sections need a membrane like TPO or EPDM. We price the options that fit your roof side by side.

Do you install metal roofs?

Yes. We install standing seam and metal shingle roofs. They cost more up front and take longer to install than shingles.

Can you roof a new addition and tie it into my old roof?

Yes. The tie-in is where additions leak, so we flash it as its own job and match the new shingles to the old ones as closely as possible.

Do you work with builders on new construction?

Yes. We plan materials, valleys, ventilation and drainage with you or your builder before anything is ordered, and we fit the install into the build schedule.

Do you pull the permit?

Yes. We pull the building permit your city requires before work starts.

What warranty comes with a new roof?

As an Owens Corning Preferred Contractor, we can offer Owens Corning’s system warranty options. We explain each option at the estimate and register the warranty in your name after the final walkthrough.

Are you licensed and insured?

Yes. Radiant Roofing is licensed, bonded and insured in Ohio, with workers’ comp coverage for our crews.

How do I get a price?

Book a free inspection for a written estimate within 24 hours, or use the instant roof quote to measure your roof from satellite imagery in about a minute.

Areas we serve

Roof installation across Cleveland's East Side.

New roofs across Cuyahoga County and the East Side, all reachable from our Bedford Heights office.

Also serving: Euclid, Gates Mills, Independence, Maple Heights, Mayfield, Mentor, Moreland Hills, Orange Village, South Euclid, Twinsburg, Valley View. Homes within about 25 miles of our Bedford Heights office can use the instant roof quote.

Common local searches we help with

  • Roof installation near me
  • New roof Cuyahoga County
  • Metal roof installation Cleveland
  • Roofer for an addition or garage
OPEN24 hours · 7 days

The sign stays lit. Call or text any hour.

Planning a new roof?

Free inspection, a written estimate within 24 hours, and a roof installed to the manufacturer’s spec.

(216) 530-6836
Book the free inspection

Takes 30 seconds. We reply within 30 minutes during business hours, first thing in the morning after hours.

Go to the form →
Tap to callText a photo